Skip to content

Irial Kennedy Design

  • Home
  • About
  • Blog
  • Portfolio
  • Services
    • CAD Design
    • All Video Work
    • Time Lapse
  • Contact
Posted on January 15, 2023August 30, 2025 by Irial

Now that most of the heavy work is finished in the house its time to start to laying the floor I the main room. #laminatefloor #houserenovation

View on Instagram https://instagr.am/p/CncWbg0Nph0/
CategoriesUncategorized TagsIFTTT, Instagram

Post navigation

Previous PostPrevious Here is the finished extractor. I had to cut the brakets a bit because our ceiling is a little lower than normal.
Next PostNext I brought the floor in around the kitchen first. Going up the center and then spreading out under the cabinets.
Proudly powered by WordPress