Skip to content

Irial Kennedy Design

  • Home
  • About
  • Blog
  • Portfolio
  • Services
    • CAD Design
    • All Video Work
    • Time Lapse
  • Contact
Posted on December 24, 2022August 30, 2025 by Irial

Our builder came and installed our stove. Now that it’s in we can install the second part of our kitchen.

View on Instagram https://instagr.am/p/CmjSzkCNjKP/
CategoriesUncategorized TagsIFTTT, Instagram

Post navigation

Previous PostPrevious Wall units are up. Sinse we have 60mm of insulated plaster board on these walls. I had to put in extra long raw plugs with super long screws to secure the French cleats to the wall.
Next PostNext Our countertop got delivered . Now I can start on the second half of our galley kitchen.
Proudly powered by WordPress