Skip to content

Irial Kennedy Design

  • Home
  • About
  • Blog
  • Portfolio
  • Services
    • CAD Design
    • All Video Work
    • Time Lapse
  • Contact

Author: Irial

Posted on January 26, 2023July 30, 2023

All done. The new old mantle piece.

View on Instagram https://instagr.am/p/Cn4VzuCNczO/
Posted on January 26, 2023July 30, 2023

I cut slots in the bottom so that I can bolt the new mantel pice to the wall.

View on Instagram https://instagr.am/p/Cn4VjXftgGg/
Posted on January 26, 2023July 30, 2023

I added concrete bolts.

View on Instagram https://instagr.am/p/Cn4VX-wtdCW/
Posted on January 26, 2023July 30, 2023

I used all the clamps to glue the teak planks together.

View on Instagram https://instagr.am/p/Cn4VFNKtUql/
Posted on January 26, 2023July 30, 2023

I used my make shift table saw to rip down the window frames to usable shapes.

View on Instagram https://instagr.am/p/Cn4U48Kt_tM/
Posted on January 26, 2023July 30, 2023

We saved the the old window frames from the sailing school. They were in the building from new and made of teak. #upcycling #teak

View on Instagram https://instagr.am/p/Cn4UpyjtFpq/
Posted on January 20, 2023

We wanted a fixed shower head so we installed a big rain shower head with solid cromed coper pipe. Attached to the wall with. Stand offs.

View on Instagram https://instagr.am/p/CnpbyWeLkPf/
Posted on January 17, 2023

That’s the toilet installed.

View on Instagram https://instagr.am/p/Cnh9PIoLtpt/
Posted on January 17, 2023

Here I marked out the base of the toilet with tape. This makes it easy to clean th3 sealant after it’s screwed down.

View on Instagram https://instagr.am/p/Cnh9A4lLwCa/
Posted on January 17, 2023

Shower tiles done.

View on Instagram https://instagr.am/p/Cnh8nD1LiPM/

Posts pagination

Page 1 Page 2 … Page 4 Next page
Proudly powered by WordPress